Engineering
As of January 1, 2023, these details are to be used on all construction drawings in the City and ETJ:
Drainage Criteria
The City of Magnolia uses the Montgomery County Drainage Criteria Manual: Link
Runoff Reduction Requirement: Drainage systems shall include a means of retention/detention to provide a 10 percent reduction in runoff from pre-construction conditions. Requests for a lower percentage reduction must be approved in writing by the City Engineer or appointee designated by the Administrator. (UDC 5-4-1.02)
RFQ: Example RFQ Title
Key Contact(s):
Hours of Operation:
Monday - Friday
8am - 4pm
Address
City of Magnolia, Texas
18111 Buddy Riley Blvd.
Magnolia, TX
77354
United States
See map: Google Maps